A before-and-after pair is satisfying. A timeline explains the work: which stage came next, where the frame changed, and how long the project actually took.

Short answer: Start one project, add a dated photo whenever the state changes, and keep the main view consistent. Choose any two entries later when you want to inspect a specific decision instead of only comparing the first and last photos.

Choose milestones, not a quota

There is no correct number of photos. Add an entry before a major change, after a repair, at a decision point, and when the project is finished. A suggested cadence is only an example; the useful cadence is the one you can keep.

Illustrative timeline · a long weekend project

This is a text example, not a product screenshot or a real customer project.

How many comparisons a series actually holds

This is the part that is easy to say and easier to see. A project with six dated entries does not hold one comparison. It holds fifteen — every entry against every later entry — and you do not have to decide in advance which one you will want.

Six entries · every comparison available
15 comparisons in a six-entry project1 of them is first against last

A sketch of the arithmetic, not a product screenshot. The outlined cell is the comparison a before-and-after keeps. The other fourteen are the ones you cannot ask for later if the entries were never taken.

Try the comparison count.

Enter the number of dated entries in a project. Each entry can pair with every later entry, so the useful comparison count grows faster than the photo count.

15 possible comparisons

Formula: n × (n − 1) ÷ 2. This is arithmetic for planning a series, not a product screenshot.

The number grows faster than the effort does. Four entries hold six comparisons; six hold fifteen; ten hold forty-five. Each new photo costs the same few seconds and adds more than the one before it, because it pairs with everything already there.

That is the practical reason to add an entry when you are unsure whether it matters. The cost of a photo you never compare is nothing. The cost of a comparison you cannot make is the whole question you wanted to answer.

Keep each entry legible

The first of those is the one people skip, and it is the one that decays. A date tells you when; it does not tell you what happened. Apr 14 means nothing a year later, while Apr 14 — filler sanded back, second coat next still reads. Label the change, not the state: the photograph already shows the state.

Gaps are information, not damage

Real projects stall. A room waits three weeks for a part, a garden waits out a season, a restoration pauses while something else takes the weekend. The instinct is to treat the gap as a hole in the series and to leave it undocumented.

A dated timeline records the gap whether you like it or not — that is what the dates are for — so the useful move is to say what it was. One entry at the start of a pause and one when work resumes turns a suspicious blank into an explained one, and answers the question you will actually have later, which is not "what did it look like" but "why did this take five months."

The same applies to a project you thought was finished. If you come back to it, add to the existing series rather than starting a new one. The comparison you want is against the original state, and that only exists in the first project.

Compare the question you actually have

Maybe you want to compare the starting state with the finished state. Maybe you want to compare the surface before a repair with the first coat after it. A timeline is more useful when it lets you choose both points instead of hard-coding one before and one after.

The examples on this page are guidance, not product evidence. The comparison counts above are arithmetic, not a claim about any particular project.

Keep the comparison honest

Changing light, moving subjects, and different lenses can still affect a comparison. The ghost is a reference that helps you match framing; it does not make different conditions identical. Choose any two dated entries when you want to inspect a change, then save or share the reveal for free.